A back-facing person with an unreadable clipboard stands in an industrial services room. Electrical cabinets line the left side; insulated metal pipes and valves rise centrally; blue equipment and green and black pipes stand at right. No legible company identity, activity quantity, supplier factor, emissions result or verification mark is visible. Equipment appearance does not establish ownership, purchased-energy classification, CHP allocation, cooling efficiency or actual metered consumption. Approved synthetic image bytes are retained unchanged.
Diagram text description
A Scope 2 emissions calculation starts with every purchased-energy stream consumed inside the reporting boundary, not just the electricity account. Electricity, steam, heating and cooling need their own quantities and compatible generation factors. Calculate emissions for each stream, then add those emissions within the same reporting method. A market-based result, where applicable, is a parallel view of the same energy, not another amount to add to the location-based total.
The difficult part is often deciding what the supplier's number describes. A steam bill may show mass rather than useful energy. A cooling bill may measure thermal output rather than the electricity that produced it. Multiplying either quantity by an ordinary electricity factor skips a conversion or a production relationship.
This walkthrough builds a reproducible, explicitly fictional four-stream ledger. It separates a fully specified teaching assumption from an actual supplier input that still needs confirmation. It is a calculation guide, not assurance, a factor library or a determination that a particular contract satisfies a reporting programme.
Set the organisational and transaction boundary
Set the organisational boundary before classifying transactions. Record which facilities and operations are included under the chosen consolidation approach, who controls the generation equipment and which entity consumes the energy. Purchased or acquired energy consumed by the reporting organisation is the Scope 2 question; the physical presence of a boiler or chiller does not settle ownership or accounting.
Fuel burned in equipment inside the organisation's direct-emissions boundary is evaluated as Scope 1 combustion, rather than counted again as purchased steam. Conversely, steam supplied by a separate organisation can be purchased energy even if its pipes run directly into the factory. Electricity purchased to run an owned chiller is electricity consumption; the chilled water that chiller produces is not a second external cooling purchase.
Keep energy acquired for resale separate from energy consumed. Establish the relevant transaction and reporting treatment rather than assuming all incoming units belong in this ledger. A landlord's allocation also needs a documented basis and reconciliation to the underlying consumption. Resolve these classifications before selecting factors: otherwise a mathematically correct multiplication can still duplicate energy or omit an entire facility.
In the top path, purchased electricity enters the reporting site and runs its owned chiller. Cooling produced inside that site is not another externally acquired energy stream. In the lower path, cooling itself is purchased from an external supplier. The figure illustrates the article’s stated transaction boundary, not a determination of ownership or consolidation for a real site.
Diagram text description
List every purchased-energy stream by facility
Create one source record per facility, supplier, stream and reporting period. Preserve the original unit before converting it, and mark a quantity as metered, billed or estimated. A single utility statement covering several services should become separate records, not one blended energy quantity.
| Stream | Original activity record | Supplier evidence to retain |
|---|---|---|
| Electricity | Metered kWh or MWh, site and billing dates | Grid region or supplier product, factor source and vintage |
| Steam | Billed mass or energy, pressure and temperature basis | Net energy definition, generation emissions and CHP allocation |
| Heat | Delivered thermal energy and meter boundary | Heat-production factor, losses and allocation basis |
| Cooling | Delivered cooling energy or refrigeration ton-hours | Production system, output denominator and factor boundary |
Table 1, shown one row at a time. Every field is retained.
Row 1
- Stream
- Electricity
- Original activity record
- Metered kWh or MWh, site and billing dates
- Supplier evidence to retain
- Grid region or supplier product, factor source and vintage
Row 2
- Stream
- Steam
- Original activity record
- Billed mass or energy, pressure and temperature basis
- Supplier evidence to retain
- Net energy definition, generation emissions and CHP allocation
Row 3
- Stream
- Heat
- Original activity record
- Delivered thermal energy and meter boundary
- Supplier evidence to retain
- Heat-production factor, losses and allocation basis
Row 4
- Stream
- Cooling
- Original activity record
- Delivered cooling energy or refrigeration ton-hours
- Supplier evidence to retain
- Production system, output denominator and factor boundary
Each row also needs supplier identity, ownership classification, estimate status and a pointer to the unchanged bill or meter export. Match reporting dates rather than simply using the invoice payment date. Where a bill straddles year-end, preserve the allocation calculation and identify any estimate. The review question is whether all consumed energy is represented once, not whether every spreadsheet cell has a number.
Match each stream to the right unit and factor
A usable factor has a denominator that means the same thing as the activity. Kilograms of CO2e per kWh of delivered cooling are not kilograms per kWh of electricity consumed by a chiller. Both contain “kWh”, but one measures useful thermal output and the other an input. Identify the energy type alongside the unit.
Convert transparently: 1 MWh equals 1,000 kWh and 3.6 GJ. One tonne of steam is 1,000 kilograms of steam, not a fixed quantity of energy. Its energy conversion depends on the stated steam conditions and reference or return-water basis. Similarly, refrigeration ton-hours measure cooling energy; they are neither tonnes of water nor operating hours alone.
Check period, geography, technology, greenhouse-gas coverage and generation boundary before multiplying. A CO2-only rate cannot silently become a complete CO2e factor. If a published factor already combines gases using specified global warming potentials, do not apply those multipliers again. Keep upstream fuel production and other lifecycle additions identifiable rather than quietly folding them into a generation-only Scope 2 result.
The public GHG Protocol overview identifies its 2015 guidance and a subsequent consultation. Consultation material is not itself an adopted rule. For an operational inventory, verify the applicable final guidance and programme requirements; the examples below do not establish compliance with an unreviewed revision.
Calculate the location-based electricity component
Fictional electricity example: Rivermoor Works consumed 10,000 kWh during calendar year 2025. Assume a suitable location-based generation factor of 0.400 kg CO2e per kWh for its fictional grid region and reporting year. The calculation is 10,000 kWh × 0.400 kg CO2e/kWh = 4,000 kg CO2e. Dividing by 1,000 converts that result to 4.000 metric tonnes CO2e.
The factor is invented for teaching, not taken from an actual region. A working record would identify the publisher, dataset release, represented year, selected geography, rate type and gas or GWP basis. Those details let another person reproduce the selection rather than merely reproduce the multiplication.
EPA's eGRID methodology distinguishes total-output rates used for electricity inventories from nonbaseload rates associated with potentially avoided generation. The latter is not an interchangeable lower factor for ordinary electricity purchases. Also reconcile the site's kWh to bills and meters before applying the rate. Choosing a more precise factor cannot correct a consumption total that includes another tenant or counts the same meter twice.
Handle market-based evidence and uncovered energy
Fictional market-based electricity example: use the same 10,000 kWh at Rivermoor Works in 2025. Assume qualifying instruments cover 6,000 kWh at an evidenced factor of 0.100 kg CO2e/kWh. The remaining 4,000 kWh uses an appropriate residual or other hierarchy factor of 0.500 kg CO2e/kWh. The covered amount produces 600 kg; the uncovered amount produces 2,000 kg. Their sum is 2,600 kg CO2e, an alternative electricity result rather than an addition to the 4,000 kg location-based amount.
Eligibility is an explicit assumption here, not a finding about a real purchase. An actual record needs evidence of the instrument, quantity, ownership or retirement, relevant market and time coverage, and the applicable quality criteria. The official guidance overview identifies eight Scope 2 quality criteria; a supplier's “green” description alone does not demonstrate that they are met.
The first 6,000 kWh contributes 600 kg CO2e; the remaining 4,000 kWh contributes 2,000 kg CO2e. The diagram adds those emissions outputs, not the factors. Contractual eligibility is an explicit teaching assumption. This market-based illustration is separate from the location-based result.
Diagram text description
Reconcile covered plus uncovered quantities to the full consumption record. Keep a documented hierarchy decision for uncovered energy and explain any unavailable residual mix. Do not fill the uncovered portion with zero, treat an offset purchase as electricity attributes, or assume an electricity instrument also covers separate steam, heat and cooling purchases.
Treat purchased steam and heat as their own calculation
Fictional steam and heat example: Rivermoor Works purchases 20 tonnes of steam and 8 GJ of separately metered heat during calendar year 2025. All supplier quantities, factors and allocation values in this example are invented. Assume the steam's useful-energy basis is a net enthalpy difference of 2.5 MJ per kilogram between the supplied steam and the stated return-water reference. This is a chosen teaching input, not a universal steam property.
| Steam transformation | Fictional value and calculation | Result |
|---|---|---|
| Mass conversion | 20 tonnes × 1,000 kg/tonne | 20,000 kg steam |
| Useful energy | 20,000 kg × 2.5 MJ/kg | 50,000 MJ |
| Energy conversion | 50,000 MJ ÷ 1,000 MJ/GJ | 50 GJ steam |
| Supplier allocation | 10,000 kg CO2e × 100 GJ ÷ 250 GJ | 4,000 kg CO2e to steam |
| Steam factor | 4,000 kg CO2e ÷ 100 GJ delivered steam | 40 kg CO2e/GJ |
| Customer emissions | 50 GJ × 40 kg CO2e/GJ | 2,000 kg CO2e |
Table 2, shown one row at a time. Every field is retained.
Row 1
- Steam transformation
- Mass conversion
- Fictional value and calculation
- 20 tonnes × 1,000 kg/tonne
- Result
- 20,000 kg steam
Row 2
- Steam transformation
- Useful energy
- Fictional value and calculation
- 20,000 kg × 2.5 MJ/kg
- Result
- 50,000 MJ
Row 3
- Steam transformation
- Energy conversion
- Fictional value and calculation
- 50,000 MJ ÷ 1,000 MJ/GJ
- Result
- 50 GJ steam
Row 4
- Steam transformation
- Supplier allocation
- Fictional value and calculation
- 10,000 kg CO2e × 100 GJ ÷ 250 GJ
- Result
- 4,000 kg CO2e to steam
Row 5
- Steam transformation
- Steam factor
- Fictional value and calculation
- 4,000 kg CO2e ÷ 100 GJ delivered steam
- Result
- 40 kg CO2e/GJ
Row 6
- Steam transformation
- Customer emissions
- Fictional value and calculation
- 50 GJ × 40 kg CO2e/GJ
- Result
- 2,000 kg CO2e
The fictional combined heat and power plant produces 150 GJ of electricity and 100 GJ of useful delivered steam in the same period. Its shared generation emissions are 10,000 kg CO2e. For this example only, allocation follows output energy: steam receives 100 ÷ (150 + 100) = 40%, while electricity receives 60%, or 6,000 kg. The two shares reconcile to the original total. Assigning all 10,000 kg to each output would duplicate emissions.
This energy-allocation assumption is not a recommendation that every CHP supplier use it. A real supplier may use a different justified allocation method, with efficiency and other methodological assumptions that affect the steam factor. Retain the selected method, output measures, fuel-emissions coverage, useful-energy boundary and treatment of distribution losses. Here, outputs and customer activity share the delivered-useful-energy basis; no additional loss uplift is applied. If a real factor is per unit generated instead, establish the conversion to the customer's delivered quantity before using it.
Steam output is 100 of 250 total useful-energy units, giving 40% and 4,000 kg CO2e. Electricity output is 150 of 250, giving 60% and 6,000 kg CO2e. The proportional bar shows these shares. This example assumes output-energy allocation; it does not establish the appropriate allocation method for every supplier.
Diagram text description
Calculate the separate heat purchase independently. Assume its fictional heat-only supplier documents a delivered-heat generation factor of 80 kg CO2e/GJ. Then 8 GJ × 80 kg CO2e/GJ = 640 kg CO2e. That factor does not come from the electricity grid or the steam allocation, and this heat purchase is not part of the steam plant's output. Keep those sources separate even when their invoices arrive together.
Open decision: obtain the actual steam supplier's allocation method and matched output and fuel-emissions evidence before replacing the fictional 40 kg CO2e/GJ factor. Consequence: the 2,000 kg steam result remains a teaching result, not a confirmed customer inventory entry; a missing allocation input is neither zero emissions nor permission to allocate everything to steam.
Calculate purchased cooling without guessing its factor
Fictional cooling example: Rivermoor Works purchases 10.8 GJ of delivered chilled energy in calendar year 2025. This is a third-party cooling service, not chilled water made by its own electricity-consuming equipment. Assume the separate supplier delivers 100 MWh of cooling while using 50 MWh of electricity for the matched production period. For this simplified example, the supplier's generation-related production factor uses an evidenced fictional electricity rate of 200 kg CO2e/MWh; all relevant production inputs and boundaries are assumed represented by that stated basis.
| Cooling transformation | Fictional calculation | Result |
|---|---|---|
| Supplier production emissions | 50 MWh electricity × 200 kg CO2e/MWh | 10,000 kg CO2e |
| Delivered-cooling factor | 10,000 kg CO2e ÷ 100 MWh cooling | 100 kg CO2e/MWh cooling |
| Customer unit conversion | 10.8 GJ ÷ 3.6 GJ/MWh | 3 MWh cooling |
| Customer emissions | 3 MWh cooling × 100 kg CO2e/MWh cooling | 300 kg CO2e |
Table 3, shown one row at a time. Every field is retained.
Row 1
- Cooling transformation
- Supplier production emissions
- Fictional calculation
- 50 MWh electricity × 200 kg CO2e/MWh
- Result
- 10,000 kg CO2e
Row 2
- Cooling transformation
- Delivered-cooling factor
- Fictional calculation
- 10,000 kg CO2e ÷ 100 MWh cooling
- Result
- 100 kg CO2e/MWh cooling
Row 3
- Cooling transformation
- Customer unit conversion
- Fictional calculation
- 10.8 GJ ÷ 3.6 GJ/MWh
- Result
- 3 MWh cooling
Row 4
- Cooling transformation
- Customer emissions
- Fictional calculation
- 3 MWh cooling × 100 kg CO2e/MWh cooling
- Result
- 300 kg CO2e
Equivalently, 3 MWh cooling equals 3,000 kWh cooling, and the factor is 0.100 kg CO2e per kWh cooling. Multiplying gives the same 300 kg. Multiplying the customer's 3 MWh cooling directly by the supplier's 200 kg electricity-input factor would instead give 600 kg and omit the production relationship. The two denominators are different, despite sharing an energy unit.
If the original bill uses refrigeration ton-hours, retain that quantity and its declared conversion to thermal energy; do not infer tonnes of refrigerant or a fixed electricity demand. Production efficiency, auxiliary loads, fuel-driven or absorption systems, and the delivered-output boundary can change the suitable factor. Do not transfer this fictional electric-chiller ratio to a different cooling system. Likewise, electricity already counted for an owned onsite chiller must not become a second purchased-cooling entry.
The denominator is 100 MWh of delivered cooling output. The supplier uses 50 MWh of electricity input, which is a different quantity and is not substituted for cooling output. Multiplying the resulting 100 kg CO2e per MWh by the customer's 3 MWh of cooling gives 300 kg CO2e.
Diagram text description
Open decision: obtain the actual cooling supplier's matched production-input and delivered-output records, including the treatment of auxiliary loads, before adopting its factor. Consequence: keep the operational cooling factor and associated inventory result unresolved; the fictional 300 kg illustrates the calculation but cannot fill the missing supplier evidence or justify an automatic grid-factor substitution.
A fictional four-stream Scope 2 ledger
Fictional four-stream ledger: Rivermoor Works, calendar year 2025. Every quantity and factor below is a teaching assumption, not a published operating value. The location-based teaching view assumes each thermal factor is suitable for its stated generation and delivered-energy boundary. All factors are expressed in CO2e on a compatible assumed gas-conversion basis.
| Purchased stream | Compatible activity | Fictional factor | Emissions |
|---|---|---|---|
| Electricity | 10,000 kWh electricity | 0.400 kg CO2e/kWh | 4,000 kg CO2e |
| Steam | 50 GJ useful steam | 40 kg CO2e/GJ | 2,000 kg CO2e |
| Heat | 8 GJ delivered heat | 80 kg CO2e/GJ | 640 kg CO2e |
| Cooling | 3 MWh delivered cooling | 100 kg CO2e/MWh | 300 kg CO2e |
Table 4, shown one row at a time. Every field is retained.
Row 1
- Purchased stream
- Electricity
- Compatible activity
- 10,000 kWh electricity
- Fictional factor
- 0.400 kg CO2e/kWh
- Emissions
- 4,000 kg CO2e
Row 2
- Purchased stream
- Steam
- Compatible activity
- 50 GJ useful steam
- Fictional factor
- 40 kg CO2e/GJ
- Emissions
- 2,000 kg CO2e
Row 3
- Purchased stream
- Heat
- Compatible activity
- 8 GJ delivered heat
- Fictional factor
- 80 kg CO2e/GJ
- Emissions
- 640 kg CO2e
Row 4
- Purchased stream
- Cooling
- Compatible activity
- 3 MWh delivered cooling
- Fictional factor
- 100 kg CO2e/MWh
- Emissions
- 300 kg CO2e
The same-method sum is 4,000 + 2,000 + 640 + 300 = 6,940 kg CO2e. Divide by 1,000 kg per metric tonne to obtain 6.940 metric tonnes CO2e. Do not add 10,000 kWh, 50 GJ and 3 MWh as if they were emissions; the ledger sums the resulting masses, not unlike activities.
For a separate illustrative market-based view, use the earlier 2,600 kg electricity result and, solely for this example, assume the same documented thermal factors are suitable for that reporting view too. Its total is 2,600 + 2,000 + 640 + 300 = 5,540 kg CO2e, or 5.540 metric tonnes. Reusing a thermal factor across views requires a supported method decision in practice; it is not automatic instrument eligibility.
Open decision: confirm the actual supplier allocation and cooling-production evidence and each thermal factor's suitability for the selected reporting method before approving a real four-stream total. Consequence: both numerical totals remain complete fictional demonstrations, while an operational ledger retains pending supplier entries and cannot be presented as verified merely because its arithmetic adds up.
Combine and disclose the results without double counting
Combine results only after identifying the reporting method attached to each stream. Within the fictional location-based ledger, 6.940 metric tonnes is the total. Within its separate market-based ledger, 5.540 metric tonnes is the total. Adding them to report 12.480 metric tonnes would count two accounting views of the same purchases, not discover additional energy use.
Keep the underlying activity record shared, with separate factor and result fields where methods differ. Record why an unchanged thermal factor is appropriate in both views, or use different supported factors if the evidence requires it. Do not mix market-based electricity with whichever thermal values happen to produce the lowest total and then label that combination location-based.
The same energy activity is evaluated through two reporting methods. Their totals are separate results, not separate emissions sources. Adding them to 12.480 tonnes would double count the activity and is explicitly invalid.
Diagram text description
Disclosure should distinguish measured and estimated activity, factor sources, reporting period, material exclusions and the basis of the method choices. If only part of an inventory is resolved, identify that status explicitly. A precise decimal total is not evidence that supplier allocation, instrument eligibility or the organisational boundary has been independently confirmed.
Reconcile missing data and review the calculation
Review from the unchanged evidence forward, rather than checking the final sum alone. A second person should be able to rebuild each activity conversion, factor selection and method-specific total without relying on the preparer's memory.
- Reconcile facility coverage, bills, meter totals and reporting dates. Separate estimates and identify overlapping statements or tenant allocations.
- Reproduce the original-unit conversions. Check steam mass against its net enthalpy basis and cooling energy against its declared output unit.
- Inspect factor provenance, represented year, geography, gas coverage and denominator. Separate generation emissions from additional lifecycle information.
- Reconcile CHP allocation shares to the supplier total and verify the cooling factor's production-input and delivered-output relationship. Keep missing supplier inputs visibly pending.
- Reconcile contractual coverage to electricity consumption, retain eligibility evidence, and reproduce each same-method sum without adding parallel totals.
If a bill is missing, document a justified estimation approach and its limitations; do not invent a bill or silently insert zero. Prioritise the uncertainty that could change the result or classification most materially. Preserve the original ledger and create a dated revision when evidence changes, so the reviewer can see both the previous assumption and its replacement.
Choose a system that preserves calculation evidence
Choose a record system by testing whether it preserves the evidence this calculation needs. Can it keep a supplier's original statement beside a converted quantity, distinguish energy inputs from useful outputs, store factor versions and retain unresolved decisions? Ask for a demonstration using the steam and cooling records rather than accepting a general promise about carbon data.
A useful handoff separates preparer, reviewer and approval status. It should preserve the calculation, the referenced evidence and the reason for any manual allocation or estimate. Exporting a spreadsheet or producing a polished dashboard does not itself validate a supplier factor, contractual claim or assurance conclusion.
These are neutral requirements for any chosen tool or service, not assertions that a particular product already offers Scope 2 calculation, contract verification or assurance. Confirm actual capabilities and responsibilities before entrusting the operational ledger to it.
Use the completed ledger for the right next question
The finished calculation should tell you which evidence to request next. A large steam result with an undocumented allocation needs a different follow-up from a complete electricity record awaiting a regional-factor update. An unresolved cooling denominator is a production-data question, not a reason to copy the electricity factor.
Use the four-stream ledger to locate those questions and keep the arithmetic traceable. Detailed electricity-factor selection and interpretation of location-based versus market-based reporting are separate, deeper tasks; neither replaces collecting the thermal purchases. Before using an operational total externally, resolve or disclose its remaining gaps and obtain the review appropriate to its intended use. Keep the fictional worked example separate from company records throughout that process.