A terminal gantry suspends a freight container above rail wagons near a truck.
Road collection, terminal handling and rail movement can each have separate shipment records.
Diagram text description

A gantry holds a dark container above rail wagons while a nearby truck carries another container. The scene illustrates an intermodal transfer.

A freight carbon footprint estimates greenhouse gas emissions for a defined shipment or transport activity. Start with the cargo and its route, then identify each vehicle movement and the facility activities that belong in the boundary. Calculate or obtain a result for each included activity, allocate shared emissions and keep the records needed to reproduce the result.

Two apparently similar shipments may use different vehicles, distances, load factors or terminals. Their factors may also cover different things. One factor might include vehicle operation only, while another includes emissions from producing the energy the vehicle uses. Keep that distinction visible before adding the numbers or comparing them.

The example below follows one fictional road–rail shipment. It shows how to allocate one truck’s emissions, how to match the three vehicle movements to their factors and what to do when terminal evidence is missing. Its transport subtotal answers a bounded question about the included legs. The missing facility rows stay open in the same record.

Choose a mode screen or a shipment record

Use a mode comparison when you need to decide which route options to investigate. Use a shipment record when you need to explain the emissions assigned to goods that moved. A route comparison can begin with modelled alternatives. An accounting record needs evidence that connects the assumed or actual movements to the named cargo.

QuestionEvidence to useWhat the result can support
Which route options deserve a closer look?Comparable assumptions for cargo, endpoints, modes, service and boundariesA first screen and a request for better information
What did this shipment travel through?Booking, dispatch, carrier and delivery records for each movement and transferA leg-level estimate with a defined boundary and version history
Can we support a change in routing?A comparable baseline and evidence of both routes, including changes in handling or serviceA decision about the modelled difference under stated conditions

Table 1, shown one row at a time. Every field is retained.

Row 1

Question
Which route options deserve a closer look?
Evidence to use
Comparable assumptions for cargo, endpoints, modes, service and boundaries
What the result can support
A first screen and a request for better information

Row 2

Question
What did this shipment travel through?
Evidence to use
Booking, dispatch, carrier and delivery records for each movement and transfer
What the result can support
A leg-level estimate with a defined boundary and version history

Row 3

Question
Can we support a change in routing?
Evidence to use
A comparable baseline and evidence of both routes, including changes in handling or service
What the result can support
A decision about the modelled difference under stated conditions

A mode screen uses typical inputs for option selection. An evidenced shipment record can inform a reporting-period corporate view or an attributable product-unit view.
A modelled teaching example cannot replace actual shipment records.
Diagram text description

The mode screen compares options with typical inputs. The shipment record uses confirmed movements, allocation and evidence. Corporate use follows the reporting entity, period and category. Product use follows attributable movements and a defined product unit. The fictional example shows how to calculate a result.

A rail line haul may look favourable in a mode screen. The actual route may also need truck collection, an extra transfer and final delivery. Add those activities consistently to the candidate routes before drawing a door-to-door conclusion. Check service assumptions such as delivery windows or temperature control because they can change what needs modelling.

Set the purpose before choosing factors. A rough screen can tolerate assumptions that would be material gaps for a customer report. Label which result you have and what decision it supports.

Start with the shipment and every transport leg

Open a record for the shipment and give each movement a leg identifier. Build the route from booking, dispatch and proof of delivery, then reconcile it with the actual carrier evidence. A shipment reference often stays constant while the carrier, load or mode changes along the way.

Leg fieldRecord to keep
Shipment and leg identifiersBooking number, carrier reference, route segment and any consignment split
Origin and destinationNamed facilities or delivery points, with a record of each handover
CargoShipment mass, units, whether packaging or equipment is included and the quantity carried on that segment
MovementMode, carrier, vehicle or service class and distance source
Timing and conditionsDispatch and delivery period, temperature requirements and known changes to the plan

Table 2, shown one row at a time. Every field is retained.

Row 1

Leg field
Shipment and leg identifiers
Record to keep
Booking number, carrier reference, route segment and any consignment split

Row 2

Leg field
Origin and destination
Record to keep
Named facilities or delivery points, with a record of each handover

Row 3

Leg field
Cargo
Record to keep
Shipment mass, units, whether packaging or equipment is included and the quantity carried on that segment

Row 4

Leg field
Movement
Record to keep
Mode, carrier, vehicle or service class and distance source

Row 5

Leg field
Timing and conditions
Record to keep
Dispatch and delivery period, temperature requirements and known changes to the plan

For a road–rail route, record road collection, terminal handling, train movement, destination terminal and final road delivery. Keep a hub activity distinguishable from the vehicle leg. Where freight is split or consolidated, verify the mass on each segment before reusing one weight for the whole route.

Mark whether distances come from logs, a routed estimate or a proxy. If the carrier diverted or used an extra transfer, record what changed and why. Match the end of one activity to the start of the next so gaps and overlaps are visible before the calculation.

Fix the fuel-cycle boundary before calculating

Choose the energy boundary before comparing leg results. In freight terminology, tank-to-wheel generally describes vehicle operation. Well-to-tank describes upstream fuel or energy supply. Well-to-wheel combines the two within the chosen method. For electric traction, check how the method treats electricity generation and supply. A vehicle with no tailpipe emissions can still use electricity with associated generation emissions.

Boundary labelWhat to check before use
Tank-to-wheel or operationWhich operating emissions and gases the method includes
Well-to-tank or upstream energyWhich extraction, production and supply processes the method includes
Well-to-wheelWhether both components are already included and use compatible units and scope
Separate facilitiesWhether handling, building energy or storage are included in a carrier result or need their own rows

Table 3, shown one row at a time. Every field is retained.

Row 1

Boundary label
Tank-to-wheel or operation
What to check before use
Which operating emissions and gases the method includes

Row 2

Boundary label
Well-to-tank or upstream energy
What to check before use
Which extraction, production and supply processes the method includes

Row 3

Boundary label
Well-to-wheel
What to check before use
Whether both components are already included and use compatible units and scope

Row 4

Boundary label
Separate facilities
What to check before use
Whether handling, building energy or storage are included in a carrier result or need their own rows

Well-to-wheel encloses upstream energy supply and tank-to-wheel vehicle operation. Check facility activities separately.
Read fuel-cycle coverage before adding upstream energy or facility activity.
Diagram text description

Tank-to-wheel describes vehicle operation. Well-to-tank describes upstream energy supply. A compatible well-to-wheel result contains both. Facility activities require their own boundary check.

The UK government’s 2026 conversion-factor methodology distinguishes freight activity bases such as whole-vehicle travel and freight carried, and identifies separate upstream energy factors. Use the appropriate dataset and row for the actual reporting method. Keep the year, vehicle class, load assumptions and boundary with the selected factor. The figures below are invented and do not come from the government tables.

A shipment study can choose a consistent well-to-wheel boundary for comparing legs. If the data also feed a corporate inventory, apply that inventory’s category and energy-boundary rules and retain enough detail to keep the components separate. Do not add an upstream factor to a result that already includes upstream energy.

Choose the strongest available activity data

Ask first what the carrier can provide for the actual movement. The GHG Protocol’s Category 4 guidance describes fuel-based, distance-based and spend-based methods for transport. The strength of a result depends on whether the activity and factor represent the route, vehicle, load and boundary relevant to your decision.

Evidence availableHow to use it
Fuel or energy for the tripApply a matching factor and allocate shared activity using a documented basis
Carrier-calculated shipment resultCheck its scope, underlying activity, allocation, factor and reporting period before use
Cargo mass and route distanceUse a compatible factor, such as kg CO₂e per tonne-kilometre, and retain the route and load assumptions
Spend or a rough route proxyScreen where physical data are missing and mark which assumptions could change the priority

Table 4, shown one row at a time. Every field is retained.

Row 1

Evidence available
Fuel or energy for the trip
How to use it
Apply a matching factor and allocate shared activity using a documented basis

Row 2

Evidence available
Carrier-calculated shipment result
How to use it
Check its scope, underlying activity, allocation, factor and reporting period before use

Row 3

Evidence available
Cargo mass and route distance
How to use it
Use a compatible factor, such as kg CO₂e per tonne-kilometre, and retain the route and load assumptions

Row 4

Evidence available
Spend or a rough route proxy
How to use it
Screen where physical data are missing and mark which assumptions could change the priority

Fuel data can reflect the actual vehicle but may cover a whole fleet, several trips or only a portion of the movement. Confirm what the record includes before applying it to the shipment. Where mass and distance are available, a tonne-kilometre is one tonne carried one kilometre. Convert kilograms to tonnes and use the actual leg distance or label the estimate.

Keep the best available method and its limitations beside each row. If a better carrier record arrives later, identify the affected leg and compare it with the original estimate before replacing it.

Allocate shared freight capacity transparently

Consider this fictional example. Merrow Supply’s shipment FM-204 weighs 2.4 tonnes. It shares a truck with other freight for the same 150 km collection leg from Arden Works to East Terminal. The truck carries 12 tonnes in total against a payload capacity of 16 tonnes. The load is therefore 75% of that capacity. All case names, quantities and factors are invented.

The shipment’s mass share is 2.4 tonnes divided by 12 tonnes, or 20%. The diagram shows the shipment as part of the loaded mass. Mass is the allocation basis in this example because the freight travels the same segment and the load is treated as weight-limited. The denominator is the actual cargo aboard that leg. Rated capacity describes utilisation and does not replace that denominator.

FM-204 weighs 2.4 tonnes, one fifth of the 12 tonnes aboard. Other cargo weighs 9.6 tonnes.
Allocate this fictional truck result by the share of cargo actually aboard.
Diagram text description

Of 12 tonnes carried, 2.4 tonnes belong to FM-204 and 9.6 tonnes are other cargo. The shipment’s share is 20%. The truck’s rated payload capacity is a separate utilisation input.

The assumed well-to-wheel factor is 0.96 kg CO₂e per vehicle-kilometre for the specified loaded truck movement. Multiply 150 vehicle-km by 0.96 to get 144 kg CO₂e for the truck. Merrow’s 20% share is 28.8 kg CO₂e. The other cargo accounts for 115.2 kg CO₂e. The two shares sum to the truck result.

Calculation checkFictional result
Vehicle activity150 vehicle-km × 0.96 kg CO₂e per vehicle-km = 144 kg CO₂e
Share attributed to FM-204144 kg CO₂e × 2.4 tonnes ÷ 12 tonnes = 28.8 kg CO₂e
Equivalent check for this load2.4 tonnes × 150 km = 360 tonne-km. At 0.08 kg CO₂e per tonne-km derived from this truck and load, the result is 28.8 kg CO₂e

Table 5, shown one row at a time. Every field is retained.

Row 1

Calculation check
Vehicle activity
Fictional result
150 vehicle-km × 0.96 kg CO₂e per vehicle-km = 144 kg CO₂e

Row 2

Calculation check
Share attributed to FM-204
Fictional result
144 kg CO₂e × 2.4 tonnes ÷ 12 tonnes = 28.8 kg CO₂e

Row 3

Calculation check
Equivalent check for this load
Fictional result
2.4 tonnes × 150 km = 360 tonne-km. At 0.08 kg CO₂e per tonne-km derived from this truck and load, the result is 28.8 kg CO₂e

Use one of those two calculation paths in the shipment ledger. The example factor covers the loaded movement and its upstream energy. Empty repositioning is outside the example and would need separate evidence if included by the reporting method. Terminal handling is also outside the factor. Keep it on its own row so it can be added once when supported.

Decide whether hubs, storage and refrigeration belong

Check what happens at each handover. A terminal can use equipment to lift or move cargo. A warehouse can use energy during storage. A temperature-controlled shipment can require electricity or fuel while it is in motion or waiting. Ask which of those activities the carrier result already covers before adding another factor.

ActivityWhat to ask forWhat to check
Terminal handlingLift or movement records, equipment energy or a suitable handling factorWhether the transport result already covers the transfer
Storage or dwellFacility, duration, service and evidence for a defensible allocationWhether the period and share fit the shipment
RefrigerationRefrigeration fuel or electricity and, where relevant, refrigerant loss informationWhether vehicle and facility records cover different periods or the same energy

Table 6, shown one row at a time. Every field is retained.

Row 1

Activity
Terminal handling
What to ask for
Lift or movement records, equipment energy or a suitable handling factor
What to check
Whether the transport result already covers the transfer

Row 2

Activity
Storage or dwell
What to ask for
Facility, duration, service and evidence for a defensible allocation
What to check
Whether the period and share fit the shipment

Row 3

Activity
Refrigeration
What to ask for
Refrigeration fuel or electricity and, where relevant, refrigerant loss information
What to check
Whether vehicle and facility records cover different periods or the same energy

A rail traction factor may exclude the lifts at either end. A carrier’s bundled door-to-door value may already include some handling. Ask for its method or breakdown, and keep a separate row marked included in the carrier result if that is what the evidence shows. If the answer is unclear, mark the row unresolved.

For FM-204, the goods travel at ambient temperature, so refrigeration is recorded as outside the service. The two terminal transfers remain separate from the vehicle estimates until their coverage and activity evidence can be established.

Keep company and product views on their own terms

One shipment can provide evidence for both a company inventory and a product study. First define which entity and transport services are being reported. Under GHG Protocol Category 4, qualifying third-party movements of purchased goods from direct suppliers and third-party logistics services purchased by the reporting company can belong in the category. That can include outbound logistics the company purchases. Transport using assets the company owns or controls is classified under the applicable rules for those assets.

Accounting viewWhat to retain
Corporate transport or value-chain categoryReporting entity and period, services purchased, activity coverage and category allocation
Product life cycle studyDefined product unit and boundary, which transport stages are included and the shipment share attributable to that product

Table 7, shown one row at a time. Every field is retained.

Row 1

Accounting view
Corporate transport or value-chain category
What to retain
Reporting entity and period, services purchased, activity coverage and category allocation

Row 2

Accounting view
Product life cycle study
What to retain
Defined product unit and boundary, which transport stages are included and the shipment share attributable to that product

For a product study, match the cargo to the products in the shipment and divide the appropriate share by the defined product units. Check which transport is already included in a supplier factor before adding another line. A shipment subtotal can be one input to the product inventory.

Keep the allocation and boundary attached to the underlying transport record. If it is reused, the reviewer should see which components were included and how the new calculation uses them.

Check the assumptions behind a generic freight estimate

A worked example for a two-kilogram parcel might use an older generic factor to show the mechanics. Its output inherits the assumed route, factor year, vehicle or service class and loading. Transferring the number to a current parcel requires evidence that those assumptions represent the new shipment. A rounded total gives little information about which assumption drives it.

If a calculator reports only one value, ask for the route and activity it used. Check whether it includes collection, transfers and delivery. Ask whether the factor represents a vehicle, a tonne of cargo or a parcel, and whether upstream fuel or electricity is already included. These details determine whether the estimate can be combined with your other records.

Use a generic figure to screen when better information is unavailable and the method permits it. State which legs are estimated, why the factor is a reasonable proxy and what would lead you to replace it. A useful next request might be actual distance, the carrier’s calculation boundary or the load evidence for the most influential leg.

Reconcile legs, units, factors and versions

Consider this fictional example. FM-204 carries the same 2.4 tonnes of ambient freight from Arden Works through East Terminal and West Terminal to Merrow’s receiving depot. The invented route file R-204 v1 records the road distances from dispatch records and the rail distance from a carrier itinerary. The factor sheet F-204 v1 is fictional and uses well-to-wheel factors for vehicle movement. No row uses a published numerical factor.

Leg or facilityActivity and factor recordIncluded result or exception
Road collection to East Terminal150 vehicle-km. F-204 v1 road A, 0.96 kg CO₂e per vehicle-km, with 20% of the loaded vehicle assigned28.800 kg CO₂e. Loaded movement only
East Terminal transferOne lift recorded. No handling energy or applicable factor in F-204 v1Open. Obtain handling evidence and confirm it is outside rail traction
Rail from East to West Terminal2.4 tonnes × 480 km = 1,152 tonne-km. F-204 v1 rail, 0.022 kg CO₂e per tonne-km25.344 kg CO₂e. Train movement only
West Terminal transfer and dwellTransfer and dwell appear in the itinerary. No energy or allocation recordOpen. Confirm the included services and request an applicable activity record
Final road delivery to Merrow2.4 tonnes × 45 km = 108 tonne-km. F-204 v1 road B, 0.095 kg CO₂e per tonne-km10.260 kg CO₂e. Vehicle movement only

Table 8, shown one row at a time. Every field is retained.

Row 1

Leg or facility
Road collection to East Terminal
Activity and factor record
150 vehicle-km. F-204 v1 road A, 0.96 kg CO₂e per vehicle-km, with 20% of the loaded vehicle assigned
Included result or exception
28.800 kg CO₂e. Loaded movement only

Row 2

Leg or facility
East Terminal transfer
Activity and factor record
One lift recorded. No handling energy or applicable factor in F-204 v1
Included result or exception
Open. Obtain handling evidence and confirm it is outside rail traction

Row 3

Leg or facility
Rail from East to West Terminal
Activity and factor record
2.4 tonnes × 480 km = 1,152 tonne-km. F-204 v1 rail, 0.022 kg CO₂e per tonne-km
Included result or exception
25.344 kg CO₂e. Train movement only

Row 4

Leg or facility
West Terminal transfer and dwell
Activity and factor record
Transfer and dwell appear in the itinerary. No energy or allocation record
Included result or exception
Open. Confirm the included services and request an applicable activity record

Row 5

Leg or facility
Final road delivery to Merrow
Activity and factor record
2.4 tonnes × 45 km = 108 tonne-km. F-204 v1 road B, 0.095 kg CO₂e per tonne-km
Included result or exception
10.260 kg CO₂e. Vehicle movement only

Fictional FM-204 travels by collection truck, East Terminal transfer, rail, West Terminal transfer and final truck. Both transfers remain open.
Keep the two unresolved terminal records separate from the three modelled vehicle legs.
Diagram text description

Record the collection, rail and delivery legs separately, with booking and leg IDs, endpoints, cargo mass, mode, date and distance source. East Terminal has a lift record. West Terminal records transfer and dwell. Their treatment evidence remains open. Refrigeration is outside the ambient service.

The three vehicle rows sum to 64.404 kg CO₂e, or 64.40 kg CO₂e for the modelled movement. The register identifies refrigeration as outside scope because the service is ambient. Empty repositioning is outside these fictional factors. The terminal records remain unresolved and are excluded from the subtotal.

The reviewer can reconcile the transport-only subtotal to R-204 v1 and F-204 v1. An all-in shipment result stays on hold until the relevant terminal evidence is available and overlap with the carrier’s records is checked. Procurement owns the transfer request and keeps the factor and route versions with the decision.

Use a booking-to-delivery evidence checklist

Use the checklist at booking, delivery and review. A booking gives the intended route. The later evidence confirms where the goods travelled and which exceptions changed the calculation. Keep the checklist with the route and factor records.

CheckpointWhat to retainWhat to resolve
BookingCargo identifier, expected route, shipment mass and service requirementsConfirm the intended boundary and allocation basis
Carrier handoverDispatch, leg distance, mode, vehicle evidence and loadsReconcile diversions, splits, shared capacity and changes of mode
Delivery and storageProof of delivery, transfers, dwell and temperature serviceMatch final destination and identify missing facility records
Factor reviewDataset, version, geography, period, gases, units and energy boundaryResolve incompatible factors and possible overlaps
ApprovalCalculation, limitations, reviewer, date and permitted useHold any result that depends on unresolved material evidence

Table 9, shown one row at a time. Every field is retained.

Row 1

Checkpoint
Booking
What to retain
Cargo identifier, expected route, shipment mass and service requirements
What to resolve
Confirm the intended boundary and allocation basis

Row 2

Checkpoint
Carrier handover
What to retain
Dispatch, leg distance, mode, vehicle evidence and loads
What to resolve
Reconcile diversions, splits, shared capacity and changes of mode

Row 3

Checkpoint
Delivery and storage
What to retain
Proof of delivery, transfers, dwell and temperature service
What to resolve
Match final destination and identify missing facility records

Row 4

Checkpoint
Factor review
What to retain
Dataset, version, geography, period, gases, units and energy boundary
What to resolve
Resolve incompatible factors and possible overlaps

Row 5

Checkpoint
Approval
What to retain
Calculation, limitations, reviewer, date and permitted use
What to resolve
Hold any result that depends on unresolved material evidence

A shipment evidence file connects carrier or proxy activity, the factor dataset and boundary, and the allocation and reviewer decision.
Keep each leg’s activity evidence, factor and review decision together.
Diagram text description

Use carrier evidence where available with its method disclosed. Mark proxies and generic rates. Retain factor dataset, version, year, region, unit, gases and fuel-cycle scope. Record allocation, omissions and the reviewer decision alongside the result.

Ask someone who did not assemble the estimate to trace a line from source record to factor and calculation. If a correction changes a leg, preserve the original and log the reason for the new version. For FM-204 the next evidence request goes to the terminals. The transport-only value remains labelled while procurement checks whether the facilities can be added.

Link the transport record to the product identifier only after confirming which units travelled. Keep the supplier, shipment, product revision and quantity associated with the purchase. If one consignment covers several products, preserve the mass or other basis used for each share. That lets the next analyst trace the number back to the movement instead of relying on a catalogue label.

Choose one shipment to test the record. Reconcile the route, apply the boundary and name an owner for any missing terminal or carrier evidence. Keep the factor version and allocation with the result. Send the completed rows and the open exceptions to the reviewer together. When evidence changes, update the affected rows and retain the decision explaining which result can be used.