A person reviews a clipboard beside a screen overlooking an industrial site.
A waste estimate starts with evidence of the material and its actual treatment route.
Diagram text description

A person studies a clipboard beside a monitor with an abstract dashboard. Industrial buildings and basins are visible through the window.

A landfill emission factor estimates greenhouse gas emissions per unit of a specified waste stream sent to landfill under a defined method. To use it, match the waste type, disposal route, geography, reporting period and mass unit. Check which gases and activities the factor includes, and the time over which treatment emissions are attributed to the waste.

A factor for mixed municipal waste can carry very different assumptions from a factor for segregated paper. Two factors with the same mass denominator may also treat collection transport, landfill equipment or gas recovery differently. Start with the weighbridge or contractor record, identify where the material actually went and then inspect the factor’s source notes.

The fictional example in this guide follows one cardboard disposal record through factor selection. It shows why an archived mixed-waste value fails even if its units can be converted. The audit template gives the next reviewer the source, boundary and unresolved items needed to decide whether an estimate can be used.

Identify the reporting boundary and who operates the waste facility

Start with the reporting company and its organisational boundary. GHG Protocol Scope 3 Category 5 covers relevant third-party treatment of waste generated in the company’s operations. If the company owns or controls a landfill within its reporting boundary, classify the facility’s direct emissions and purchased energy under the applicable Scope 1 and Scope 2 rules. The same treatment activity can sit in a different scope for the waste generator and the facility operator.

Reporting situationWhat to establish
Company sends operational waste to a third-party landfillThe company’s waste amount, material, actual route and attribution under Category 5
Company operates a landfill within its own boundaryThe facility’s direct releases and purchased energy, with their appropriate scope treatment
Company estimates treatment of sold products at end of lifeThe separate product or corporate category boundary and the evidence for the disposal route

Table 1, shown one row at a time. Every field is retained.

Row 1

Reporting situation
Company sends operational waste to a third-party landfill
What to establish
The company’s waste amount, material, actual route and attribution under Category 5

Row 2

Reporting situation
Company operates a landfill within its own boundary
What to establish
The facility’s direct releases and purchased energy, with their appropriate scope treatment

Row 3

Reporting situation
Company estimates treatment of sold products at end of life
What to establish
The separate product or corporate category boundary and the evidence for the disposal route

Read the contract and disposal confirmation together. A hauler may transfer waste to another operator or to a sorting facility first. A collection invoice establishes that something was collected. A disposal record shows where it went and, where relevant, how much reached the landfill.

Define the reporting period for the waste and keep it distinct from the period of the emissions model. If a factor attributes later methane emissions to waste generated this year, keep that convention visible so another reviewer can interpret the result.

Choose the factor method from the activity data you actually have

Ask what the contractor can establish before choosing a calculation method. GHG Protocol Category 5 guidance describes supplier-specific, waste-type-specific and average-data approaches. The most specific evidence is useful only if it represents the company’s actual waste and the method being reported.

MethodEvidence neededWhat to check
Supplier-specificWaste treatment emissions or an attributed result from the providerCoverage, allocation to your waste, period, facility and treatment stages
Waste-type-specificMass by material and actual treatment route, with suitable factorsWhether the material and route classifications match the dataset and contractor evidence
Average dataA defensible total mass and documented average treatment assumptionsWhich composition or routes are estimated and whether the method fits the intended use

Table 2, shown one row at a time. Every field is retained.

Row 1

Method
Supplier-specific
Evidence needed
Waste treatment emissions or an attributed result from the provider
What to check
Coverage, allocation to your waste, period, facility and treatment stages

Row 2

Method
Waste-type-specific
Evidence needed
Mass by material and actual treatment route, with suitable factors
What to check
Whether the material and route classifications match the dataset and contractor evidence

Row 3

Method
Average data
Evidence needed
A defensible total mass and documented average treatment assumptions
What to check
Which composition or routes are estimated and whether the method fits the intended use

A contractor’s site-wide annual methane number needs a defensible basis for attributing emissions to your waste. Request the method and any allocation before using it. Where the contractor can confirm mass and treatment but has no attributed result, look for a suitable material and route factor.

If the available records do not show where the waste went, mark the gap and use a documented average only if the reporting approach permits it. Keep the estimate separate from values backed by a confirmed route. Explain what would replace it, such as a disposal ticket or a breakdown by treatment stream.

Match the waste type, disposal route and facility conditions

Record what was disposed of and what conditions the selected method represents. Organic material can decompose and generate methane. Its composition, moisture and landfill conditions affect how much forms and how quickly. Some methane is recovered or oxidised before release. These effects vary by site, timing and method, so read the assumptions behind an average.

Waste or site featureWhat to check
Food and other readily degradable materialComposition and the treatment and decay assumptions the factor represents
Paper and cardboardMaterial classification, contamination and the basis of the waste mass
Mixed residual wasteWhich materials the mix assumes and how close it is to the measured stream
Plastic or metalWhether the factor covers disposal operations and how it treats material that contributes little to biological methane generation
Landfill gas and coverWhat the factor assumes about capture, treatment and oxidation before emission

Table 3, shown one row at a time. Every field is retained.

Row 1

Waste or site feature
Food and other readily degradable material
What to check
Composition and the treatment and decay assumptions the factor represents

Row 2

Waste or site feature
Paper and cardboard
What to check
Material classification, contamination and the basis of the waste mass

Row 3

Waste or site feature
Mixed residual waste
What to check
Which materials the mix assumes and how close it is to the measured stream

Row 4

Waste or site feature
Plastic or metal
What to check
Whether the factor covers disposal operations and how it treats material that contributes little to biological methane generation

Row 5

Waste or site feature
Landfill gas and cover
What to check
What the factor assumes about capture, treatment and oxidation before emission

A factor can include emissions from operating the landfill even for materials with low methane generation. It may leave upstream manufacturing outside its boundary. Keep the material’s production footprint separate from the waste treatment estimate unless the study explicitly includes both and reconciles them.

For a site-specific claim, obtain site and waste evidence for the method. A national or regional default can support an estimate in a matching context, with its limitations disclosed. It cannot establish the gas capture performance of an individual site.

Check factor source, year, geography and current version

Go back to the publisher and the exact release. Record the workbook or report, table or row, source geography, data year, release and any revision notes. A reporting year describes when your waste was generated. The factor’s data year describes the evidence it represents. The publication date tells you when the dataset was issued. Keep all three where they differ.

For example, a listing for a 2023 value marked deprecated or replaced belongs in the historical record. Follow the publisher’s replacement and compare its scope and assumptions before using it. A copied search snippet can omit material, treatment, geography and version, even when it shows the number and unit.

The UK government’s 2026 conversion-factor publication and methodology explain where to find waste disposal factors and how the dataset approaches waste routes. Use the actual table and notes to select a value for an applicable case. EPA’s factor publication uses its own definitions and assumptions. Neither a landing page nor a year label identifies the right row by itself.

Keep the original factor when reproducing a historical estimate. If you revise the calculation with a different source, record the reason and whether the difference reflects changed waste activity, new evidence or a method change.

Match the mass unit to the factor denominator

Check the mass unit on both the ticket and the factor. A metric tonne is 1,000 kilograms. A US short ton is 2,000 pounds, or 907.18474 kilograms. EPA’s waste-factor table uses short tons for its denominator. A mass recorded in metric tonnes cannot be used directly with that denominator.

Suppose a fictional weighbridge record shows 2,400 kilograms. For a factor per metric tonne, divide by 1,000 to get 2.40 tonnes. If the source instead calls for US short tons, divide 2,400 by 907.18474 to get about 2.646 short tons. Preserve the unrounded result for a calculation and label the unit in the estimate. Neither conversion resolves a mismatch in waste material or geography.

Fictional 2,400 kilograms is 2.40 metric tonnes or about 2.646 US short tons. Use the unit in the factor denominator.
Convert the measured mass to the unit in the factor denominator before multiplying.
Diagram text description

A fictional ticket gives 2,400 kilograms. Divide by 1,000 for 2.40 metric tonnes. Divide by 907.18474 for about 2.646 US short tons. Use the relevant conversion and preserve the unrounded amount in the calculation.

Check the numerator separately. A factor in metric tonnes of carbon dioxide equivalent, or CO₂e, produces tonnes of CO₂e when multiplied by the matching waste activity. Convert to kilograms of CO₂e only if the reporting unit requires it. A value reported as mass of methane would need the required climate conversion before being combined with other greenhouse gases.

Record gross and tare weights or the contractor’s net amount, the waste classification and whether the mass is as received or on another basis. Reconcile that basis with the selected factor before multiplication.

Read the boundary notes before adding transport or avoided emissions

Inspect the source boundary before adding transport, equipment or a gas recovery estimate. EPA’s 2025 waste table notes that its landfill factors include assumed transport to the landfill, equipment use and landfill methane. The notes exclude avoided emissions associated with energy recovery and landfill carbon storage. Those statements apply to that publication’s factors. Other sources can define their boundary differently.

Boundary itemWhat to do
Collection and transportCheck whether the chosen factor includes transport and which movement it represents before adding a separate leg
Landfill equipment and treatmentKeep the included processes with the selected row and ask about any exclusions
Gas recovery or avoided emissionsRead the method’s treatment of recovery and keep avoided effects outside the inventory total where the reporting approach requires separate reporting

Table 4, shown one row at a time. Every field is retained.

Row 1

Boundary item
Collection and transport
What to do
Check whether the chosen factor includes transport and which movement it represents before adding a separate leg

Row 2

Boundary item
Landfill equipment and treatment
What to do
Keep the included processes with the selected row and ask about any exclusions

Row 3

Boundary item
Gas recovery or avoided emissions
What to do
Read the method’s treatment of recovery and keep avoided effects outside the inventory total where the reporting approach requires separate reporting

EPA provides separate guidance for using its inventory factors and its Waste Reduction Model, or WARM, which can be used to compare management scenarios. A scenario difference or avoided impact answers a different question from the treatment emissions attributed to a waste stream. Keep the baseline and boundaries explicit if you present a scenario analysis.

If the source is unclear about transport, ask for its calculation notes. Until you know the coverage, hold the overlapping line or report a clearly bounded subtotal. Do the same when a contractor reports a combined collection and treatment figure.

Separate landfill methane modelling from company waste accounting

A national greenhouse gas inventory asks how much methane solid waste disposal sites emit during a period. The IPCC first-order decay method estimates methane generated over time from waste deposited in different years. Depending on the model inputs, it accounts for methane recovery and oxidation when estimating emissions. Waste deposited in earlier years can contribute to the current year’s result.

A company waste estimate can ask which treatment emissions the reporting method attributes to the waste the company generated during the reporting year. Under Category 5 guidance this can include future emissions resulting from that waste. The diagram contrasts the two questions. A national or facility annual total cannot simply be divided by current-year waste and applied to a company stream without a defensible method.

A reporting-year inventory captures emissions in that year from waste deposited across years. A cohort estimate can attribute treatment across years to waste deposited in one year.
The reporting-year view and the deposited-waste cohort view answer different questions.
Diagram text description

The left view groups waste from several years as contributors to methane emitted in the reporting year. The right view starts with waste deposited in the selected year and follows the treatment emissions attributed to that cohort across years. No emission rate or decay curve is shown.

If an operator supplies a facility result, request how it was calculated and how the share was assigned. Check whether the figure measures the reporting period’s emissions, models emissions attributable to a specified waste cohort, or does something else. Then check the material and time boundary against the company’s accounting method.

Keep the landfill model assumptions and the company’s activity records separately identifiable. The reviewer should be able to see why a factor applies to the disposal quantity and why its emissions may occur over a different period.

Choose a factor for a fictional cardboard disposal record

Consider this fictional example. Alder Bindery generates segregated corrugated cardboard waste in England during its 2026 reporting year. A contractor’s weighbridge ticket shows 2,400 kilograms as received. A separate disposal ticket confirms landfill rather than recycling. The business uses third-party treatment and wants an internal Category 5 estimate. All company, facility and factor-record identifiers are invented.

Review fieldFilled entry
Activity and routeTicket W-62 records 2,400 kg of segregated corrugated cardboard. Disposal record D-62 confirms third-party landfill
Candidate selectedFictional operator report LP-26 rev 2, row Card-LF. It describes cardboard at the receiving site in kg CO₂e per metric tonne as received
Method and boundaryThe row attributes modelled landfill treatment over the method’s stated horizon to the waste received. It includes landfill equipment and treatment methane. Collection and avoided effects are excluded
Alternative rejectedAn archived fictional 2023 US mixed-waste row uses short tons and a different composition, geography and gas assumptions. Unit conversion would leave those mismatches unresolved
Decision and open evidenceSelect the operator row for the treatment estimate. Convert 2,400 kg to 2.40 metric tonnes. Procurement requests separate collection evidence and keeps that part unresolved

Table 5, shown one row at a time. Every field is retained.

Row 1

Review field
Activity and route
Filled entry
Ticket W-62 records 2,400 kg of segregated corrugated cardboard. Disposal record D-62 confirms third-party landfill

Row 2

Review field
Candidate selected
Filled entry
Fictional operator report LP-26 rev 2, row Card-LF. It describes cardboard at the receiving site in kg CO₂e per metric tonne as received

Row 3

Review field
Method and boundary
Filled entry
The row attributes modelled landfill treatment over the method’s stated horizon to the waste received. It includes landfill equipment and treatment methane. Collection and avoided effects are excluded

Row 4

Review field
Alternative rejected
Filled entry
An archived fictional 2023 US mixed-waste row uses short tons and a different composition, geography and gas assumptions. Unit conversion would leave those mismatches unresolved

Row 5

Review field
Decision and open evidence
Filled entry
Select the operator row for the treatment estimate. Convert 2,400 kg to 2.40 metric tonnes. Procurement requests separate collection evidence and keeps that part unresolved

Fictional records W-62, D-62 and LP-26 revision 2 establish 2,400 kilograms, landfill and the cardboard factor row.
The fictional treatment decision rests on the mass ticket, disposal confirmation and the factor report.
Diagram text description

Ticket W-62 establishes the mass. Disposal record D-62 confirms landfill. Operator report LP-26 revision 2 provides the Card-LF factor row for the site and material. The adjacent table records why the archived alternative is unsuitable and why collection remains open.

The reviewer uses the matching row for the treatment component because it covers the material, site, period and mass basis. This example records the factor choice without supplying a numerical factor or a treatment total. If the underlying operator report does not substantiate the method or its applicability in an actual case, hold the selection and record the gap.

Keep W-62, D-62, the selected report and the rejected alternative with the decision. Reopen it if the route changes or the operator revises the assumptions. Collection remains a separate item if it is within the reporting boundary.

The audit record to keep with every landfill estimate

Use the same audit fields for each waste stream or treatment route. If one contractor line covers several materials, split it only where the evidence supports the split. Preserve the original record and show which parts remain estimated.

Audit fieldWhat to record
Activity and periodWaste stream, origin, reporting period, source ticket and original measured amount
Disposal route and evidenceContractor, receiving facility or route confirmation, and unresolved classification
Units and conversionOriginal mass unit and basis, factor denominator, conversion and output unit
Factor and provenancePublisher, exact file and row, release, data year, geography and version
Boundary and assumptionsIncluded treatment, transport, equipment, energy recovery treatment and time boundary
Estimate and limitationsCalculation reference, result, permitted use, unresolved evidence and any proxy
Owner and refresh triggerReviewer, responsible owner, decision date, next action and reason to recalculate

Table 6, shown one row at a time. Every field is retained.

Row 1

Audit field
Activity and period
What to record
Waste stream, origin, reporting period, source ticket and original measured amount

Row 2

Audit field
Disposal route and evidence
What to record
Contractor, receiving facility or route confirmation, and unresolved classification

Row 3

Audit field
Units and conversion
What to record
Original mass unit and basis, factor denominator, conversion and output unit

Row 4

Audit field
Factor and provenance
What to record
Publisher, exact file and row, release, data year, geography and version

Row 5

Audit field
Boundary and assumptions
What to record
Included treatment, transport, equipment, energy recovery treatment and time boundary

Row 6

Audit field
Estimate and limitations
What to record
Calculation reference, result, permitted use, unresolved evidence and any proxy

Row 7

Audit field
Owner and refresh trigger
What to record
Reviewer, responsible owner, decision date, next action and reason to recalculate

Ask the reviewer to trace one row from the disposal ticket through the converted mass to the exact factor and its notes. Check that a separate transport row does not repeat an included service. If the selected factor changes, keep the previous result and state whether the revision affects a published or internal period.

For the fictional cardboard example, the open item is collection evidence. Keep it visible until the responsible owner can confirm which activity should be estimated and whether it belongs in the reporting boundary.

Connect the estimate to the waste records

Connect the waste estimate to the records that describe how the material arose. Where the waste comes from manufacturing or packing, keep the product revision, material description and site with the waste record when those details help identify the stream. A bill of materials can explain which material was used. The disposal ticket and contractor records establish which quantity reached the treatment route.

Choose one material stream to review first. Obtain its measured mass and route, identify the intended reporting boundary and record why the factor fits. Give any unresolved question to the person who can obtain the relevant evidence. For Alder Bindery, that means getting the collection record and deciding whether the transport belongs in the estimate. When the contractor changes the route or the publisher updates the factor, revisit the estimate and preserve the earlier decision.