A metal bottle and detached cap sit beside a carton, a scale and material samples.
Identify the bottle, closure and packaging before gathering material and process data.
Diagram text description

A metal bottle, detached dark cap and cylindrical carton sit on a workbench with material samples, a caliper, paperwork and a scale with no visible reading.

This product carbon footprint calculation example uses five rows to estimate greenhouse gas emissions for one packed promotional bottle. For each row, multiply the quantity used per bottle by a factor with the matching unit. Then add the line results. The worked total is about 2.11 kg CO₂e per packed bottle for the activities shown. All inputs and factors are invented to make the arithmetic inspectable.

A product carbon footprint describes climate impact for a specified product, unit and boundary. Carbon dioxide equivalent, or CO₂e, expresses the climate contribution of different greenhouse gases on a common basis. A corporate inventory uses an organisation and reporting period as its frame, while a broader life cycle assessment can consider other environmental impacts.

The worked example stops at selected factory-gate activities. The input register and sensitivity comparison show how the result depends on purchased mass, shared electricity and freight. Use the example to check the method and see which evidence a real calculation would need before anyone relied on its total.

Define the unit and the boundary first

Write the unit at the top of the file. For this example it is one finished Morrow Trail promotional bottle, SKU MT-500 revision D, with its cap, seal and carton, at the factory gate. The model uses a fictional 500-bottle production run in 2025. The denominator is the number of good packed units, which gives the calculation a clear basis for allocating batch activity.

Boundary itemTreatment in the example
Upstream inputsInclude production of steel, the cap-and-seal assembly and the carton
Transport to the factoryInclude one assumed consolidated road leg for the three inputs
Factory activityInclude the allocated electricity for the bottle run
Other gate activitiesLeave process heat, consumables and treatment of production scrap outside the calculation
Later life-cycle stagesExclude delivery after the factory gate, use, washing, replacements and end of life

Table 1, shown one row at a time. Every field is retained.

Row 1

Boundary item
Upstream inputs
Treatment in the example
Include production of steel, the cap-and-seal assembly and the carton

Row 2

Boundary item
Transport to the factory
Treatment in the example
Include one assumed consolidated road leg for the three inputs

Row 3

Boundary item
Factory activity
Treatment in the example
Include the allocated electricity for the bottle run

Row 4

Boundary item
Other gate activities
Treatment in the example
Leave process heat, consumables and treatment of production scrap outside the calculation

Row 5

Boundary item
Later life-cycle stages
Treatment in the example
Exclude delivery after the factory gate, use, washing, replacements and end of life

Inside the selected factory-gate example are materials, inbound truck and allocated electricity. Later delivery, use and end of life sit outside.
The fictional unit is one packed bottle at the factory gate.
Diagram text description

The five rows cover steel, cap and seal, carton, allocated machine electricity and inbound truck movement. Downstream delivery, use and end of life are outside the example. See the table and worked total for other exclusions.

Record where each supplier factor ends. Here the three input factors stop at their suppliers’ gates, so the consolidated journey enters once. The exclusions within the factory activities make this a partial gate estimate. If the objective were a full cradle-to-gate study, assess the significance of each omission and obtain the missing records before deciding whether the boundary and result are fit for use.

Build the input register from the product record

Start with the product record and the batch, then assign each quantity to a source. A bill of materials, or BOM, gives the parts and packaging in the packed bottle. The factory issue and scrap records are needed to identify how much steel entered the process. Reconcile those records against the accepted output before multiplying by an emissions factor.

Input to collectFictional source referenceActivity to record
SteelBOM D and material issue sheet MI-5000.36 kg steel issued per good bottle, with scrap recorded separately
Cap and sealBOM D and supplier component sheet CS-180.06 kg for the complete purchased assembly
CartonPacking specification PK-D0.04 kg of carton per good packed bottle
Machine electricityMeter sheet E-10 and run log H-4350 kWh across 10 machine hours, of which four hours serve the bottle run
Inbound freightHypothetical shipment record T-650650 km by truck, with the input mass for each packed bottle assigned to the same leg

Table 2, shown one row at a time. Every field is retained.

Row 1

Input to collect
Steel
Fictional source reference
BOM D and material issue sheet MI-500
Activity to record
0.36 kg steel issued per good bottle, with scrap recorded separately

Row 2

Input to collect
Cap and seal
Fictional source reference
BOM D and supplier component sheet CS-18
Activity to record
0.06 kg for the complete purchased assembly

Row 3

Input to collect
Carton
Fictional source reference
Packing specification PK-D
Activity to record
0.04 kg of carton per good packed bottle

Row 4

Input to collect
Machine electricity
Fictional source reference
Meter sheet E-10 and run log H-4
Activity to record
350 kWh across 10 machine hours, of which four hours serve the bottle run

Row 5

Input to collect
Inbound freight
Fictional source reference
Hypothetical shipment record T-650
Activity to record
650 km by truck, with the input mass for each packed bottle assigned to the same leg

These references and quantities are fictional. In a real record, store the original data period, units, facility, supplier and version beside each value. A supplier response may cover a site or product family rather than the item you buy. Ask what it represents, then keep the original attachment and any adjustment. If a record is missing, name its owner and show whether you have used a proxy or left the input unresolved.

Use quantity × factor for each included line

Calculate each line only after the activity quantity and factor refer to the same process and unit. For a material factor stated per kilogram, use the kilograms of that material attributable to one packed bottle. For electricity, allocate the batch share first and divide by good output. Freight requires the mass carried and the distance, expressed in the unit specified by the factor.

ActivityMatching factor unitWhat the product of the two means
Kilograms of steel for one packed bottlekg CO₂e per kg of steelkg CO₂e for steel per packed bottle
Kilowatt-hours allocated to one packed bottlekg CO₂e per kWhkg CO₂e for electricity per packed bottle
Tonne-kilometres attributable to one packed bottlekg CO₂e per tonne-kilometrekg CO₂e for transport per packed bottle

Table 3, shown one row at a time. Every field is retained.

Row 1

Activity
Kilograms of steel for one packed bottle
Matching factor unit
kg CO₂e per kg of steel
What the product of the two means
kg CO₂e for steel per packed bottle

Row 2

Activity
Kilowatt-hours allocated to one packed bottle
Matching factor unit
kg CO₂e per kWh
What the product of the two means
kg CO₂e for electricity per packed bottle

Row 3

Activity
Tonne-kilometres attributable to one packed bottle
Matching factor unit
kg CO₂e per tonne-kilometre
What the product of the two means
kg CO₂e for transport per packed bottle

Check the boundary as well as the unit. A factor for a tonne of purchased steel delivered to the factory may already include a journey you are modelling separately. A factor for raw polymer cannot represent a complete purchased cap and seal unless the rest of the assembly’s activities are added on a consistent basis.

Store the unrounded line values and the factor source, date and method version. Round the reported total only after adding the lines so the reviewer can reproduce the arithmetic.

Five calculation rows for one packed bottle

Consider this fictional example. The following five rows use invented activity quantities and placeholder factors for one MT-500 revision D bottle packed at the factory gate. The 500 good packed units are the denominator for batch quantities. Material and carton factors end at the respective suppliers’ gates. The freight row adds the assumed delivery leg to the bottle factory.

The electricity meter recorded an assumed 350 kWh over ten hours at similar load. The bottle run used four hours, so its share is 350 kWh × 4 ÷ 10 = 140 kWh. Divide by 500 good bottles to get 0.28 kWh per packed bottle. For freight, the steel, cap-and-seal assembly and carton total 0.46 kg of inbound mass per bottle. Convert that to 0.00046 tonnes and multiply by 650 km to get 0.299 tonne-km.

Included sourceActivity per packed bottleInvented factorLine arithmetic in kg CO₂e
Steel production0.36 kg purchased input4.80 kg CO₂e per kg0.36 × 4.80 = 1.72800
Cap-and-seal assembly0.06 kg purchased assembly3.20 kg CO₂e per kg0.06 × 3.20 = 0.19200
Carton production0.04 kg carton0.70 kg CO₂e per kg0.04 × 0.70 = 0.02800
Machine electricity0.28 kWh allocated0.45 kg CO₂e per kWh0.28 × 0.45 = 0.12600
Inbound truck transport0.299 tonne-km0.12 kg CO₂e per tonne-km0.299 × 0.12 = 0.03588

Table 4, shown one row at a time. Every field is retained.

Row 1

Included source
Steel production
Activity per packed bottle
0.36 kg purchased input
Invented factor
4.80 kg CO₂e per kg
Line arithmetic in kg CO₂e
0.36 × 4.80 = 1.72800

Row 2

Included source
Cap-and-seal assembly
Activity per packed bottle
0.06 kg purchased assembly
Invented factor
3.20 kg CO₂e per kg
Line arithmetic in kg CO₂e
0.06 × 3.20 = 0.19200

Row 3

Included source
Carton production
Activity per packed bottle
0.04 kg carton
Invented factor
0.70 kg CO₂e per kg
Line arithmetic in kg CO₂e
0.04 × 0.70 = 0.02800

Row 4

Included source
Machine electricity
Activity per packed bottle
0.28 kWh allocated
Invented factor
0.45 kg CO₂e per kWh
Line arithmetic in kg CO₂e
0.28 × 0.45 = 0.12600

Row 5

Included source
Inbound truck transport
Activity per packed bottle
0.299 tonne-km
Invented factor
0.12 kg CO₂e per tonne-km
Line arithmetic in kg CO₂e
0.299 × 0.12 = 0.03588

Adding the five results gives 2.10988 kg CO₂e per packed bottle, or about 2.11 kg CO₂e at the precision used here. Steel is the largest line at 1.728 kg CO₂e. The result covers only the listed rows and leaves facility heat, consumables, scrap treatment and downstream activities outside. The figures demonstrate the method and have no standing as measurements or emissions factors for a real product.

Of 2.10988 kilograms of carbon dioxide equivalent per fictional packed bottle, steel contributes 1.728 and the other four rows contribute 0.38188.
Steel contributes about 82% of the fictional five-row total.
Diagram text description

The full strip represents 2.10988 kilograms of carbon dioxide equivalent per packed bottle. Steel production contributes 1.728. The other four rows together contribute 0.38188. The preceding table keeps their individual values visible.

Why scrap changes the material calculation

Use the steel issued to production when the model is accounting for the upstream production of that material. The body weighs 0.30 kg in the fictional example, but the process uses 0.36 kg. The extra 0.06 kg leaves as scrap. The diagram shows those shares of the same input. All 0.36 kg receives the steel production factor, and the example assigns no recycling credit.

The fictional 0.36 kilogram steel input divides into a 0.30 kilogram body and 0.06 kilograms of scrap. No scrap credit is assumed.
The purchased steel includes both the finished body and processing scrap.
Diagram text description

Five sixths of the fictional steel input becomes the 0.30 kilogram finished body. One sixth leaves the process as 0.06 kilograms of scrap. The calculation assigns no scrap credit.

At the batch level, 500 bodies account for 150 kg of finished steel. The implied steel input is 180 kg and the scrap is 30 kg. Reconcile this balance against measured issue and scrap records in an actual study. Record where material loss occurs and how the study treats its disposal or recovery. A balanced mass record does not decide the appropriate recycling method.

The shared meter poses a different question. It measures electricity across more than one run, so the example allocates electricity by machine hours at assumed similar loads. A different product or operating speed might use more power per hour. Where that matters, obtain run-level metering or test a better-supported physical driver. Keep the meter total, allocation basis and good output count together so another analyst can reconstruct the per-bottle value.

Keep units, factor sources and versions together

Keep the factor and its evidence on the same line as the activity. At minimum record its original unit, dataset or supplier, version, period, geography, technology and included processes. Keep the unconverted value as well as the value used in the calculation. That makes it possible to check the conversion if the supplier sends an updated record.

Factor recordDetails a reviewer needs
Steel or component factorProduct grade or assembly, factory or regional representation, time period, production boundary and kg CO₂e per kg
Electricity factorGrid or supply context, factor method and period, and kg CO₂e per kWh
Freight factorMode, region, period, load and empty-running treatment where relevant, and kg CO₂e per tonne-km

Table 5, shown one row at a time. Every field is retained.

Row 1

Factor record
Steel or component factor
Details a reviewer needs
Product grade or assembly, factory or regional representation, time period, production boundary and kg CO₂e per kg

Row 2

Factor record
Electricity factor
Details a reviewer needs
Grid or supply context, factor method and period, and kg CO₂e per kWh

Row 3

Factor record
Freight factor
Details a reviewer needs
Mode, region, period, load and empty-running treatment where relevant, and kg CO₂e per tonne-km

In the example, 0.46 kg becomes 0.00046 tonnes before multiplying by kilometres. Applying the freight factor to 0.46 × 650 would overstate that line by a factor of 1,000 because the factor expects tonnes. Keep the original shipment mass and the conversion so a reviewer can see where the decimal came from.

Label placeholders clearly. The worked freight factor has no external dataset or version. For a real study, select an appropriate factor for the route and vehicle assumptions and record its source before replacing the placeholder. If a factor is old or represents another geography, explain why it is still usable or request a better match.

Test the assumptions before quoting the total

Consider this fictional example. Hold the finished body mass at 0.30 kg and test a change in steel yield from the original 0.30 ÷ 0.36, about 83.3%, to 90%. At 90% yield the model requires 0.30 ÷ 0.90, or about 0.3333 kg of steel per good body. The assumed road leg still carries the steel, cap-and-seal assembly and carton, so it also reflects the change in input mass.

Quantity or resultOriginal assumptionAt 90% yield
Steel input per good bottle0.36 kg0.3333 kg, rounded for display
Steel emissions per good bottle1.728 kg CO₂e1.600 kg CO₂e
Combined inbound mass per good bottle0.46 kg0.4333 kg, rounded for display
Inbound freight emissions per good bottle0.03588 kg CO₂e0.03380 kg CO₂e
Five-row total per good bottle2.10988 kg CO₂e1.97980 kg CO₂e

Table 6, shown one row at a time. Every field is retained.

Row 1

Quantity or result
Steel input per good bottle
Original assumption
0.36 kg
At 90% yield
0.3333 kg, rounded for display

Row 2

Quantity or result
Steel emissions per good bottle
Original assumption
1.728 kg CO₂e
At 90% yield
1.600 kg CO₂e

Row 3

Quantity or result
Combined inbound mass per good bottle
Original assumption
0.46 kg
At 90% yield
0.4333 kg, rounded for display

Row 4

Quantity or result
Inbound freight emissions per good bottle
Original assumption
0.03588 kg CO₂e
At 90% yield
0.03380 kg CO₂e

Row 5

Quantity or result
Five-row total per good bottle
Original assumption
2.10988 kg CO₂e
At 90% yield
1.97980 kg CO₂e

At 90% fictional steel yield, lower steel input changes both the steel production and inbound freight rows.
Changing steel yield changes purchased mass and inbound freight for the same packed bottle.
Diagram text description

At the fictional 90% yield, the steel production row changes from 1.728 to 1.600 kilograms of carbon dioxide equivalent. The inbound freight row changes from 0.03588 to 0.03380. The example keeps the other three rows fixed and uses the same boundary.

The alternative uses the unrounded input in both changed lines. Keep the same material factors, route, electricity, packaging and closure activity. The difference is about 0.13 kg CO₂e per packed bottle under those assumptions. It is a sensitivity result for the same selected activities, with the same exclusions. If a yield improvement also changes machine energy or scrap treatment, assess those effects separately before claiming an achieved reduction.

To accept a real update, match the revision and batch, reconcile steel issued with good output and scrap, and check that the factor still represents the grade, site and period. If an input is inconsistent or unavailable, keep the original assumption visible and assign the gap to production or procurement. Ask the reviewer to rerun both cases from the saved sheet before using the comparison.

Keep the result within the stated boundary

A factory gate marks the point where the packed product leaves the manufacturing site. The worked figure describes the listed activities leading to that point. It leaves the route to the customer, washing and other use, replacement parts and end-of-life treatment outside the calculation. It also excludes some factory activities. Name the included rows when sharing the example so the reader can see the scope.

If the decision is about the impact of providing drinks over time, define the service first. Two bottles with different lifetimes may require different numbers of bodies and lids to deliver the same number of fills. Model their expected washing, replacements and end-of-life treatment on a consistent basis. A per-bottle gate figure can be an input to that study, provided its boundary and data match the new model.

For a production question, such as whether to reduce forming scrap, the gate data can still help. Compare the same product configuration and good output, check for changes in other process inputs and describe the result within those conditions. That keeps the conclusion tied to the decision the evidence can support.

Check what verification covers

ISO 14067 addresses quantifying and reporting the carbon footprint of a product, including a partial footprint, for climate change. Its public scope description separates that work from offsetting and communication. In this example, a correct calculation shows that the assumed inputs produce the stated sum. Verification involves reviewing evidence and methods against the requirements and scope of the applicable process.

Before relying on a verified figure, check which product, boundary, site, period, method and records the verification covered. A supplier’s corporate assurance or a verified dataset for a different grade may leave the product calculation outside that scope. A label or disclosure scheme can have additional requirements, so identify the programme that applies to the intended use before preparing a public statement.

Record the status of the number when sharing it. A reviewer can reproduce the fictional arithmetic with the inputs provided. Real-world verification needs real activity evidence, appropriate factors and a review of the study assumptions.

Organise product and supplier records

Organise the product inputs so the next analyst can see what was bought, what was made and which records were used. Start with one SKU and its revision. Map the supplier codes for the steel, closure and carton to the BOM. Then connect the quantities and site records to the batch and the number of good packed units.

If a supplier replaces the cap assembly under the same purchasing code, record the configuration change before rolling forward the estimate. Check whether it changes the mass, grade or production route. The earlier factor may still describe older batches, so retain both versions with the affected dates and record which calculation uses each one. If a supplier gives a combined factor, confirm what the assembly includes before using a separate value for the seal.

Assign a product record owner and a method reviewer. Procurement can resolve part and supplier identities, production can confirm the batch and yield, and the reviewer can decide whether the factors and allocations fit. A traceable product file makes that review possible and gives the team a place to record the next unresolved evidence request.

Build a repeatable product-footprint record

Build the next calculation from a specific product revision and one period with reliable production records. Save the declared unit and boundary with the input register, the original units, the factor sources and the formula for each line. Record which items are measured, modelled or still unresolved. Keep a copy of the calculation that produced the figure you share.

For the bottle example, the most useful next evidence would be the actual steel grade and production factor, alongside batch issue, scrap and output records. Recalculate the steel and freight lines after validating those records. Then ask the reviewer whether the estimate can guide the intended production decision and when it needs refreshing. Send the boundary, review status and open items with the total so the next reader can use the record on the same terms.